American-standard Swan 6011 User Manual

Browse online or download User Manual for Accessories for water American-standard Swan 6011. American Standard Swan 6011 User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 4
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
IN WALL PRESSURE BALANCING
BATH AND SHOWER SETS
To assure proper positioning in relation to wall,
note roughing-in dimensions.
Thank you for selecting American-Standard...the benchmark of fine
quality for over 100 years.
To ensure that your installation proceeds smoothly--please read these
instructions carefully before you begin.
ROUGHING-IN DIMENSIONS
Certified to comply with ANSI A112.18.1
Installation
Instructions
SWAN
6011
6012
THREADED INLETS (STOPS)
INLETS
1/2" NPT
5-7/8"
INLETS 1/2" NPT
OUTLETS
1/2" NPT
OUTLETS
1/2" NPT
3-3/8"
3-3/8"
3-3/8"
THREADED INLETS
Required Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Plumbers' Putty or Caulking
Phillips Screwdriver
1
ROUGHING-IN
Turn off water at main supply.
CAUTION
When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering,
flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread
sealant or Teflon tape on threaded connections.
NOTE
If the valve is installed on a fiberglass
or other thin wall application, the
PLASTER GUARD (4) can be used as a support.
Connect hot and cold water supplies.
Cap off shower pipe (5) and tub filler pipe (6).
For support, use pipe BRACES (7) secured to wooden braces.
With valve turned off, turn on water supplies. Check for leaks.
COLD
HOT
Cut a 4" dia. hole in the shower stall.
Drill two additional 1" holes to allow access
to the stops.
Remove PLASTER GUARD (4), rotate 90˚
so that indicated screw holes fit MANIFOLD (2).
Push CAP on valve, place ESCUTCHEON on and
attach with screws.
1
7
5
3
6
4
2
See Roughing-in diagram before starting.
Connections are:
1/2" female NPT for threaded inlets
Connect RISER PIPE (1) to MANIFOLD (2)
top outlet marked "SHR".
Connect TUB FILLER PIPE (3) at bottom
outlet marked "TUB".
For proper positioning the finished wall
must be within side wall of PLASTER
GUARD (4).
FINISHED WALL
4"
BOTTOM OF TUB
74" FOR HEAD
CLEARANCE
18" OPTIONAL
5" REF.
1/2" NPT
1-5/8"
to
3-1/4"
7-1/8"
1-1/2"
MIN.
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 80''
TOP OF TUB RIM
4" REF.
5-1/2" REF.
M968462S-O
1/2" COPPER
SLIP-ON
SPOUT
Tubing Cutter
Page view 0
1 2 3 4

Summary of Contents

Page 1 - Instructions

IN WALL PRESSURE BALANCINGBATH AND SHOWER SETSTo assure proper positioning in relation to wall,note roughing-in dimensions. Thank you for selecting Am

Page 2

3INSTALL HANDLEADJUST HOT LIMIT STOPBy restricting HANDLE rotation and limiting the amount of hotwater allowed to mix with the cold, the HOT LIMIT SAF

Page 3 - A COARSE SURFACE

5Remove handle SET SCREW, remove HANDLE, unscrew HANDLE SCREW and remove ADAPTER.Remove two SCREWS holding ESCUTCHEON and remove ESCUTCHEON.Remove COV

Page 4 - BATH AND SHOWER SETS

A954440-0070ACARTRIDGE023603-0070ACARTRIDGE SCREWSA923611-0070AHOT LIMIT STOPM961854-0070AFIXATION RING WITH SCREWSM952100-0070APRESSURE BALANCING UNI

Comments to this Manuals

No comments