American-standard Hampton 7220.712 User Manual

Browse online or download User Manual for Accessories for water American-standard Hampton 7220.712. American Standard Hampton 7220.712 User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 2
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Installation
Instructions
U S 6 0 4 0 6 R E V. 1. 2
Certified to comply with ANSI A112.18.1M
FINISHED
WALL
1-1/4 DIA HOLE
4
TOP OF
TUB RIM
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 78''
1/2" N.P.T.
SHOWER ARM
BOTTOM OF TUB
ROUGHING-IN DIMENSIONS
5 REF.
7 REF.
18 OPTIONAL
NOTE: NO CONCEALED PIPING FURNISHED
2" MIN.
3-1/4" MAX.
74 FOR HEAD CLEARANCE
U.S. Patent No. 5,819,789
(2) 1-13/16" DIA. HOLES
FOR VALVES ON 8"
CENTERS (1) 1-13/16"
DIA. HOLE FOR CENTER
TRANSFER VALVE
CROSS
BRACE
1-3/4
TYP.
1-3/4
UNION INLET
1/2"-14 N.P.T.
1/2" N.P.T. TO
SHOWER
Turn off hot and cold water
supplies before beginning.
CAUTION
1
ROUGHING-IN
SHOWER AND SPOUT
2
3
4
1
5
UNION
SWIVEL
"HOT"
"COLD"
7
COUPLING
NUT
IMPORTANT: DO NOT REMOVE PLASTER GUARDS (2) UNTIL STEP 2.
(SHR)
6
Recommended Tools
*Hex key Supplied with Fitting
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Plumbers' Putty or Caulking
Phillips Screwdriver
TWO HANDLE BATH/SHOWER SET
5-1/8"
REF.
1" MIN.
4"
1/2" COPPER
8
10
9
7220.702
7220.712
7220.722
7220.732
7221.702
7221.712
CROSS
BRACE
"COLD"
"MAX WALL"
PLASTER
GUARD
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P
Prepare water supplies per Roughing-in Dimensions. Apply sealing tape
to all threaded connections.
Install VALVE (1) at indicated height and depth. Make sure the outlet marked
"SHR" is pointing upward. Mount VALVE (1) to cross brace with wood screws.
Slip COUPLING NUT over supply pipe and thread UNION SWIVEL to pipe.
Connect HOT
(6) water supply to LEFT valve inlet and COLD (7) water supply
to RIGHT valve inlet.
Prepare SHOWER RISER (4) and ELBOW (3). Connect to TOP outlet, marked
"SHR" of VALVE BODY (1).
Prepare TUB FILLER PIPE (8), ELBOW (10) and roughing-in COPPER PIPE (9).
Connect to BOTTOM outlet of VALVE BODY (1).
Add cross braces to wall structure and secure piping.
Cap NIPPLES (5) and COPPER PIPE (9). Open supply lines and check for leaks.
Remove PLASTER GUARDS (2). Use spline on end of PLASTER GUARD (2) to
open both VALVES and check for leaks.
Close both valves and turn off water supplies. Replace PLASTER GUARDS (2).
Finish wall construction.
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--
please read these instructions carefully before you begin.
7221.722
7221.732
7222.702
7222.712
7222.722
7222.732
Page view 0
1 2

Summary of Contents

Page 1 - Instructions

InstallationInstructionsU S 6 0 4 0 6 R E V. 1. 2Certified to comply with ANSI A112.18.1M FINISHEDWALL1-1/4 DIA HOLE4TOP OFTUB RIMOPTIONAL TO FIN

Page 2 - FOR CROSS HANDLES

U S 6 0 4 0 6 R E V. 1. 22INSTALL TRIM (SHOWER AND TUB SPOUT)NOTE; PROTECT FINISH ON SHOWER AND TUB TRIM WHEN INSTALLING.To change direction of handl

Comments to this Manuals

No comments